Road 90 preservations – southern segment

Elevating the segment from kilometer 202 to 204, including junction p44, for protection against flooding and drainage problems. The project includes the relocation of communication, electricity and water (Mekorot) infrastructures, earthworks to elevate the road and upgrade water transfers.

 

Planned end date: September 2015

Status: בביצוע

Road 90 preservations – northern segment

An integrated project of transportation infrastructure and tourism infrastructure, elevating Road 90 while providing an answer for protection from flooding and drainage issues, a combination of earthworks and paving and the placement of water transfers with the establishment of a 4 kilometer promenade parallel to the road including shading at the southern end of the Dead Sea in accordance with the standards of the National Roads Company.

 

Planned end date: december 2015

Status: בביצוע

Elevating preservation battery for Leonardo Club (Nirvana) public beach

Elevating the public beach battery in accordance with the fixed level including the arrangement of drainage infrastructure and elevating a barrier in the beach area, landscaping rehabilitation of the beach and arranging the interface between the hotel yard and the elevated beach battery.

 

Planned end date: decmber 2015

Status: בביצוע

Elevating preservation battery for Herods (Moria) public beach

Elevating the public beach battery in accordance with the fixed level including the arrangement of drainage infrastructure and elevating a barrier in the beach area, landscaping rehabilitation of the beach and arranging the interface between the hotel yard and the elevated beach battery.

 

Planned end date: September 2015

Status: בביצוע

Elevating batteries for Meridian public beach

Elevating and expanding the Meridian public beach battery, landscaping rehabilitation of the beach, making it accessible to bathers and arranging it to prevent flooding, including arrangement of emergency routes and the beach operation, and arranging the interface with the Boqeq River and the promenade from Road 90.

 

Planned end date: november 2015

 

Status: בביצוע

Arranging drainage, rehabilitation and development of Boqeq River

Arranging and increasing water flow in the Boqeq River water carrier and canal to the flow of the hydrological envelope in accordance with the new standards, with an emphasis on its integration in the environmental landscape and suiting its level to the fixed level and the hotels road.

 

Planned end date: november 2015

Status: בביצוע

Protection and development of the Ein Boqeq Hotels road

Arranging the drainage, electricity and communication infrastructure, landscape rehabilitation and arrangement of roads in the hotels road between the Boqeq River Bridge and the Isrotel Hotel.

 

Planned end date: third quarter of 2016

Status: בביצוע

Elevation and expansion of Ein Boqeq public beach

Elevation and expansion of the public beach battery at Ein Boqeq between the Lot Hotel (to the south) and the Solarium (to the north) and the fixed level including arrangement of the drainage infrastructure in the beach area, landscape rehabilitation of the beach and arranging the interface between the structures bordering on the elevated beach battery, arranging drainage infrastructure and adapting the public parking lots to the constraints of the new beach battery including the elevation of electricity and water infrastructures, relocation of a sewage pumping station and improving the efficiency of the groundwater lowering alignment in the region.

 

Planned end date: third quarter of 2016

 

Status: בביצוע

Leonardo Club hotel and public beach protections

Performance of works to protect the foundations of Leonardo Club Hotel and prepare infrastructure for elevating the battery including beach development works. The works included the installation of a barrier from steel scaffolding, the installation of infrastructures for groundwater lowering, electricity, and drainage systems around the hotel.

Period of execution: 2011-2012

Status: הסתיים

Herods hotel and public beach protections

Elevation and expansion of protection battery facing the Herods hotel, performance of development and landscape rehabilitation works in the beach.

Period of execution: 2011-2012

Status: הסתיים

Neve Zohar public beach battery protections

Adjustment of Neve Zohar beach to permanent level while providing a response to the hazards in the region caused by flooding. The following have been performed, among others: dismantling of flooded facilities, filling, relocation of communication lines, and construction of a new sewage line.

Period of execution: 2012

Status: הסתיים

Solmed public beach urgent intermediate protections

Elevation and expansion of Hamei Zohar Solmed public beach including arrangement of sulfur water drilling infrastructure and performance of beach landscape rehabilitation.

Period of execution: 2011-2012

Status: הסתיים

Road 90 preservations – southern segment

Elevating the segment from kilometer 202 to 204, including junction p44, for protection against flooding and drainage problems. The project includes the relocation of communication, electricity and water (Mekorot) infrastructures, earthworks to elevate the road and upgrade water transfers.

 

Planned end date: September 2015

Status: בביצוע

Road 90 preservations – northern segment

An integrated project of transportation infrastructure and tourism infrastructure, elevating Road 90 while providing an answer for protection from flooding and drainage issues, a combination of earthworks and paving and the placement of water transfers with the establishment of a 4 kilometer promenade parallel to the road including shading at the southern end of the Dead Sea in accordance with the standards of the National Roads Company.

 

Planned end date: december 2015

Status: בביצוע

Elevating preservation battery for Leonardo Club (Nirvana) public beach

Elevating the public beach battery in accordance with the fixed level including the arrangement of drainage infrastructure and elevating a barrier in the beach area, landscaping rehabilitation of the beach and arranging the interface between the hotel yard and the elevated beach battery.

 

Planned end date: decmber 2015

Status: בביצוע

Elevating preservation battery for Herods (Moria) public beach

Elevating the public beach battery in accordance with the fixed level including the arrangement of drainage infrastructure and elevating a barrier in the beach area, landscaping rehabilitation of the beach and arranging the interface between the hotel yard and the elevated beach battery.

 

Planned end date: September 2015

Status: בביצוע

Elevating batteries for Meridian public beach

Elevating and expanding the Meridian public beach battery, landscaping rehabilitation of the beach, making it accessible to bathers and arranging it to prevent flooding, including arrangement of emergency routes and the beach operation, and arranging the interface with the Boqeq River and the promenade from Road 90.

 

Planned end date: november 2015

 

Status: בביצוע

Arranging drainage, rehabilitation and development of Boqeq River

Arranging and increasing water flow in the Boqeq River water carrier and canal to the flow of the hydrological envelope in accordance with the new standards, with an emphasis on its integration in the environmental landscape and suiting its level to the fixed level and the hotels road.

 

Planned end date: november 2015

Status: בביצוע

Protection and development of the Ein Boqeq Hotels road

Arranging the drainage, electricity and communication infrastructure, landscape rehabilitation and arrangement of roads in the hotels road between the Boqeq River Bridge and the Isrotel Hotel.

 

Planned end date: third quarter of 2016

Status: בביצוע

Elevation and expansion of Ein Boqeq public beach

Elevation and expansion of the public beach battery at Ein Boqeq between the Lot Hotel (to the south) and the Solarium (to the north) and the fixed level including arrangement of the drainage infrastructure in the beach area, landscape rehabilitation of the beach and arranging the interface between the structures bordering on the elevated beach battery, arranging drainage infrastructure and adapting the public parking lots to the constraints of the new beach battery including the elevation of electricity and water infrastructures, relocation of a sewage pumping station and improving the efficiency of the groundwater lowering alignment in the region.

 

Planned end date: third quarter of 2016

 

Status: בביצוע

Leonardo Club hotel and public beach protections

Performance of works to protect the foundations of Leonardo Club Hotel and prepare infrastructure for elevating the battery including beach development works. The works included the installation of a barrier from steel scaffolding, the installation of infrastructures for groundwater lowering, electricity, and drainage systems around the hotel.

Period of execution: 2011-2012

Status: הסתיים

Herods hotel and public beach protections

Elevation and expansion of protection battery facing the Herods hotel, performance of development and landscape rehabilitation works in the beach.

Period of execution: 2011-2012

Status: הסתיים

Neve Zohar public beach battery protections

Adjustment of Neve Zohar beach to permanent level while providing a response to the hazards in the region caused by flooding. The following have been performed, among others: dismantling of flooded facilities, filling, relocation of communication lines, and construction of a new sewage line.

Period of execution: 2012

Status: הסתיים

Solmed public beach urgent intermediate protections

Elevation and expansion of Hamei Zohar Solmed public beach including arrangement of sulfur water drilling infrastructure and performance of beach landscape rehabilitation.

Period of execution: 2011-2012

Status: הסתיים

Regulation of Boqeq River drainage

Elevating walls of Morad canal and increasing capacity for the transfer of floodwater by 15%.

Period of execution: 2009

Status: הסתיים

Daniel public beach urgent intermediate protections

Elevation and expansion of Daniel beach including beach landscape rehabilitation and organization of the beach and its facilities which were damaged by flooding.

Period of execution: 2011

Status: הסתיים

Lot Hotel public beach urgent intermediate protections

Elevation and expansion of Lot public beach including arrangement of drainage infrastructure in the beach region, landscape rehabilitation of the beach and regulation of flooded peninsula, adjustment of hotel yards to new battery height.

Period of execution: 2011-2012

Status: הסתיים

Solarium public beach urgent intermediate protections

Elevation and expansion of the beach to the permanent level, landscape rehabilitation of Solarium beach and arranging it for use, rehabilitating infrastructures and arranging the Solarium facilities in accordance with the new beach battery’s height.

Period of execution: 2011-2012

Status: הסתיים

Arrangement of Park Dekalim drainage outlet

A project combining tourism development of an amphitheater at Ein Boqeq which combines the engineering functionality of a reservoir and a pumping station for floods, preparation of plumbing infrastructures for the future drainage system and performance of a drainage route from Park Dekalim to Boqeq River.

Period of execution: 2009-2011

Status: הסתיים

Establishment of a sewage pumping station at Ein Boqeq

Upgrading and rehabilitation of the main sewage pumping station at Ein Boqeq, adjusting it to the permanent level of pond 5 and the level of groundwater for the long range. The project is an environmental engineering project combining special architecture in the heart of the tourism district.

Period of execution: 2011

Status: הסתיים

Elevation of public beaches for the four Ein Boqeq hotels

Elevation and expansion of the public beach battery at Ein Boqeq (from the Hod Hotel beach to the Lot hotel beach) to the permanent level including arrangement of drainage infrastructure and a clay barrier in the beach region, landscape rehabilitation of the beach and making the beach accessible in accordance with the rules of the Ministry of the Interior and the relevant accessibility standards.

Period of execution: 2014

Status: הסתיים

Regulation of P5 junction and Yeelim River Bridge

Regulation of P5 junction to create transportation access to the harvesting project in the Yeelim river region. The project includes:

Earthworks, paving and building a bridge.

Planned start date: April 2016

Status: בתכנון

Regulation of Tamarit Junction

Regulation of Tamarit junction to create transportation access to the harvesting project.

Planned start date: April 2016

Status: בתכנון

Intermediate area defenses

Elevation and arrangement of all infrastructures in the region (roads, promenade, beaches battery, water and sewage systems electricity and communication systems) and landscape rehabilitation in accordance with the permanent level.

Planned start date: july 2016

Status: בתכנון

Infrastructure upgrade and lowering systems at Hamei Zohar

Arranging drainage, electricity, and communications infrastructure, landscape rehabilitation and arranging the roads on the hotels road between the intermediate zone and Neve Zohar.

Planned start date: april 2016 

Status: בתכנון

Sorting drainage of channels 19-21

Arranging runoff drainage channels at Hamei Zohar region with adjustment for permanent level.

Planned start date: april 2016

Status: בתכנון

Reestablishment of Ein Gedi sewage alignment

Re-planning of the sewage pumping station alignment at Ein Gedi due to the location of the stations and the plumbing route in an area with sinkholes. The planning includes the establishment of new pumping stations including an electricity and control alignment, plumbing for the stations, and the installation of supply pipelines.

Planned start date: april 2016

Status: בתכנון