Projects
Regulation of Boqeq River drainage
Elevating walls of Morad canal and increasing capacity for the transfer of floodwater by 15%.
Period of execution: 2009
Status: הסתיים
Daniel public beach urgent intermediate protections
Elevation and expansion of Daniel beach including beach landscape rehabilitation and organization of the beach and its facilities which were damaged by flooding.
Period of execution: 2011
Status: הסתיים
Lot Hotel public beach urgent intermediate protections
Elevation and expansion of Lot public beach including arrangement of drainage infrastructure in the beach region, landscape rehabilitation of the beach and regulation of flooded peninsula, adjustment of hotel yards to new battery height.
Period of execution: 2011-2012
Status: הסתיים
Hamei Zohar religious public beach urgent intermediate protections
Elevation and expansion of religious public beach including arrangement of drainage in beach area and performance of landscape rehabilitation.
Period of execution: 2011-2012
Status: הסתיים
Establishment of groundwater lowering systems at Leonardo Club and Leonardo Plaza (Herods) hotels’ p
Establishment and upgrading of systems and infrastructure for groundwater lowering to the permanent level to protect the hotels’ foundations, installation of about 50 pumps for lowering groundwater, including electricity and water plumbing infrastructures around the hotels, piezometers, electrical backup and control system.
Period of execution: 2013-2014
Status: הסתיים
Solarium public beach urgent intermediate protections
Elevation and expansion of the beach to the permanent level, landscape rehabilitation of Solarium beach and arranging it for use, rehabilitating infrastructures and arranging the Solarium facilities in accordance with the new beach battery’s height.
Period of execution: 2011-2012
Status: הסתיים
Crown Plaza public beach intermediate protections
Elevation and expansion of the Crown Plaza public beach including landscape rehabilitation of the beach.
Period of execution: 2010
Status: הסתיים
Arrangement of Park Dekalim drainage outlet
A project combining tourism development of an amphitheater at Ein Boqeq which combines the engineering functionality of a reservoir and a pumping station for floods, preparation of plumbing infrastructures for the future drainage system and performance of a drainage route from Park Dekalim to Boqeq River.
Period of execution: 2009-2011
Status: הסתיים
(Establishment of a groundwater lowering alignment at Ein Boqeq (Samet alignment
Establishing an alignment of 73 groundwater lowering pumps at Ein Boqeq.
Period of execution: 2009
Status: הסתיים
Establishment of a sewage pumping station at Ein Boqeq
Upgrading and rehabilitation of the main sewage pumping station at Ein Boqeq, adjusting it to the permanent level of pond 5 and the level of groundwater for the long range. The project is an environmental engineering project combining special architecture in the heart of the tourism district.
Period of execution: 2011
Status: הסתיים
Establishment of International beach pumping station
Protection and rehabilitation of sewage pumping station due to infiltration of corrosive groundwater.
Period of execution: 2012
Status: הסתיים
Elevation of public beaches for the four Ein Boqeq hotels
Elevation and expansion of the public beach battery at Ein Boqeq (from the Hod Hotel beach to the Lot hotel beach) to the permanent level including arrangement of drainage infrastructure and a clay barrier in the beach region, landscape rehabilitation of the beach and making the beach accessible in accordance with the rules of the Ministry of the Interior and the relevant accessibility standards.
Period of execution: 2014
Status: הסתיים
Regulation of P5 junction and Yeelim River Bridge
Regulation of P5 junction to create transportation access to the harvesting project in the Yeelim river region. The project includes:
Earthworks, paving and building a bridge.
Planned start date: April 2016
Status: בתכנון
Regulation of Tamarit Junction
Regulation of Tamarit junction to create transportation access to the harvesting project.
Planned start date: April 2016
Status: בתכנון
Intermediate area defenses
Elevation and arrangement of all infrastructures in the region (roads, promenade, beaches battery, water and sewage systems electricity and communication systems) and landscape rehabilitation in accordance with the permanent level.
Planned start date: july 2016
Status: בתכנון