Performance of works to protect the foundations of Leonardo Club Hotel and prepare infrastructure for elevating the battery including beach development works. The works included the installation of a barrier from steel scaffolding, the installation of infrastructures for groundwater lowering, electricity, and drainage systems around the hotel.
Period of execution: 2011-2012
Elevation and expansion of protection battery facing the Herods hotel, performance of development and landscape rehabilitation works in the beach.
Period of execution: 2011-2012
Adjustment of Neve Zohar beach to permanent level while providing a response to the hazards in the region caused by flooding. The following have been performed, among others: dismantling of flooded facilities, filling, relocation of communication lines, and construction of a new sewage line.
Period of execution: 2012
Elevation and expansion of Hamei Zohar Solmed public beach including arrangement of sulfur water drilling infrastructure and performance of beach landscape rehabilitation.
Period of execution: 2011-2012
Elevating walls of Morad canal and increasing capacity for the transfer of floodwater by 15%.
Period of execution: 2009
Elevation and expansion of Daniel beach including beach landscape rehabilitation and organization of the beach and its facilities which were damaged by flooding.
Period of execution: 2011
Elevation and expansion of Lot public beach including arrangement of drainage infrastructure in the beach region, landscape rehabilitation of the beach and regulation of flooded peninsula, adjustment of hotel yards to new battery height.
Period of execution: 2011-2012
Elevation and expansion of religious public beach including arrangement of drainage in beach area and performance of landscape rehabilitation.
Period of execution: 2011-2012
Establishment and upgrading of systems and infrastructure for groundwater lowering to the permanent level to protect the hotels’ foundations, installation of about 50 pumps for lowering groundwater, including electricity and water plumbing infrastructures around the hotels, piezometers, electrical backup and control system.
Period of execution: 2013-2014
Elevation and expansion of the beach to the permanent level, landscape rehabilitation of Solarium beach and arranging it for use, rehabilitating infrastructures and arranging the Solarium facilities in accordance with the new beach battery’s height.
Period of execution: 2011-2012
Elevation and expansion of the Crown Plaza public beach including landscape rehabilitation of the beach.
Period of execution: 2010
A project combining tourism development of an amphitheater at Ein Boqeq which combines the engineering functionality of a reservoir and a pumping station for floods, preparation of plumbing infrastructures for the future drainage system and performance of a drainage route from Park Dekalim to Boqeq River.
Period of execution: 2009-2011
Establishing an alignment of 73 groundwater lowering pumps at Ein Boqeq.
Period of execution: 2009
Upgrading and rehabilitation of the main sewage pumping station at Ein Boqeq, adjusting it to the permanent level of pond 5 and the level of groundwater for the long range. The project is an environmental engineering project combining special architecture in the heart of the tourism district.
Period of execution: 2011
Protection and rehabilitation of sewage pumping station due to infiltration of corrosive groundwater.
Period of execution: 2012
Elevation and expansion of the public beach battery at Ein Boqeq (from the Hod Hotel beach to the Lot hotel beach) to the permanent level including arrangement of drainage infrastructure and a clay barrier in the beach region, landscape rehabilitation of the beach and making the beach accessible in accordance with the rules of the Ministry of the Interior and the relevant accessibility standards.
Period of execution: 2014