Establishment of a sewage pumping station at Ein Boqeq
Status הסתיים
Upgrading and rehabilitation of the main sewage pumping station at Ein Boqeq, adjusting it to the permanent level of pond 5 and the level of groundwater for the long range. The project is an environmental engineering project combining special architecture in the heart of the tourism district.
Period of execution: 2011