Arranging drainage, rehabilitation and development of Boqeq River
Status בביצוע
Arranging and increasing water flow in the Boqeq River water carrier and canal to the flow of the hydrological envelope in accordance with the new standards, with an emphasis on its integration in the environmental landscape and suiting its level to the fixed level and the hotels road.
Planned end date: november 2015